Burrinjuck Power Station Metal compact boring
  • Burringjuck Station
    Portable Borer for Main Inlet Valve
  • Turbine refurbishment
  • Australia
  • Meridian Energy, 2004 Seismic Restraints for Hall Roof Trusses
  • Maintenance, Repair & Overhaul
  • Aviemore, NZ
  • Matahina Hydro Station
  • Maintenance, Repair & Overhaul
  • Whakatane, NZ
  • Genesis Energy, 2009 Headgate
  • Maintenance, Repair & Overhaul
  • Tekapo A, NZ
  • Meridian Energy,
    2011 AC1 Replacement
  • Maintenance, Repair & Overhaul
  • Manapouri, NZ
  • Meridian Energy, 2011 Draft Tube
  • Maintenance, Repair & Overhaul
  • Ohau A, NZ
  • Contact Energy, 2014
    Machining & Refurb of G1 Gen Unit
  • Maintenance, Repair & Overhaul
  • Clyde, NZ
  • Aviemore Hydro Dam
    Crane Upgrade
  • Maintenance, Repair & Overhaul
  • Aviemore, NZ
  • Meridian Energy, 2013
    Draft Tube Stoplog Refurbishment
  • Maintenance, Repair & Overhaul
  • Aviemore, NZ
  • Meridian Energy, Headgate Seal Design Change & Install
  • Maintenance, Repair & Overhaul
  • Aviemore, NZ
  • Ohau Dam
  • Maintenance, Repair & Overhaul
  • New Zealand
  • Meridian Energy
    Pukaki Gate 19 Refurbishment
  • Maintenance, Repair & Overhaul
  • Pukaki, NZ
  • Meridian Energy, 2016 G3 Overhaul and Wicket Gate Refurb
  • Maintenance, Repair & Overhaul
  • Waitaki, NZ
  • Meridian Energy, 2003 Major Overhaul of One Generation Unit
  • Maintenance, Repair & Overhaul
  • Tekapo, NZ
  • Manawa 2015, 1A Unit Overhaul
  • Maintenance, Repair & Overhaul
  • Waipori, NZ
  • Meridian Energy, Head Gate Ram Inspection & Seals
  • Maintenance, Repair & Overhaul
  • Manapouri, NZ
  • Meridian Energy,
    2004-2009 Half Life Upgrade
  • Maintenance, Repair & Overhaul
  • Manapouri, NZ
  • Pioneer Generation, 2009-10
    Talla Burn 2.1 Meg Hydro Gen Unit
  • Maintenance, Repair & Overhaul
  • Beaumont, NZ