To do the repairs the team modified and reconfigured the boring machine used for the Burrinjuck job and used it to repair similar issues within the Matahinia Station. As well as the repairs onsite, a new set of pole keys were designed and manufactured in the workshop.
The team would love to thank Trustpower for the care they received in terms of their health and wellbeing. A regular highlight being the smoothie truck that came twice a week.