The two new PMUs were custom designed to match the layout and dimensions of the Mozal smelter and incorporated the newest innovations for PMUs.
These innovations included trackless relocation, dual gantry cages, and pit brushing units.
Key Facts
Commissioning on Site: With the extensive testing Farra completes in the workshop, each PMU can be commissioned on site within three days.
Running Times: Our PMUs are designed to run 24 hours a day, seven days a week.
Unit Weight: Each unit weighs 12.8 tonnes.
Installed: The PMUs were installed on site in November 2018.